ログイン
言語:

WEKO3

  • トップ
  • ランキング
To
lat lon distance
To

Field does not validate



インデックスリンク

インデックスツリー

メールアドレスを入力してください。

WEKO

One fine body…

WEKO

One fine body…

アイテム

{"_buckets": {"deposit": "dae20a20-1f6d-4370-8775-f31bc0cd50b6"}, "_deposit": {"id": "7815", "owners": [], "pid": {"revision_id": 0, "type": "depid", "value": "7815"}, "status": "published"}, "_oai": {"id": "oai:niigata-u.repo.nii.ac.jp:00007815", "sets": ["456", "809"]}, "item_7_alternative_title_1": {"attribute_name": "その他のタイトル", "attribute_value_mlt": [{"subitem_alternative_title": "The Inspection Panel of the World Bank in Practice : A Case Study of the China Western Poverty Reduction Project"}]}, "item_7_biblio_info_6": {"attribute_name": "書誌情報", "attribute_value_mlt": [{"bibliographicIssueDates": {"bibliographicIssueDate": "2004-03", "bibliographicIssueDateType": "Issued"}, "bibliographicPageEnd": "189", "bibliographicPageStart": "177", "bibliographicVolumeNumber": "29", "bibliographic_titles": [{"bibliographic_title": "現代社会文化研究"}, {"bibliographic_title": "現代社会文化研究", "bibliographic_titleLang": "en"}]}]}, "item_7_description_4": {"attribute_name": "抄録", "attribute_value_mlt": [{"subitem_description": "The Inspection Panel of the World Bank was established as an appeals mechanism that receives claims from citizens who believe they have been directly harmed by the Bank\u0027s projects. Although the establishment of the Inspection Panel was an important step in moving toward more transparency of World Bank operations and the improvement in the Bank\u0027s accountability, and ultimately toward improved project quality at the Bank, there are still several problems in this Inspection Panel process that can be mentioned. This paper focuses on problems in the Inspection Panel process brought about by the Request for Inspection that alleged the Bank\u0027s non-compliance with its policies in West Poverty Reduction Project in China, and that in the Panel\u0027s investigation report for the Project. For the first time since Nepal ArunⅢ Proposed Hydroelectric Project case, the Panel was allowed to carry out its investigation,and as the result, the Bank\u0027s financing to the project was cancelled. Added to these , this paper refers to the contents of \"1999 Conclusions of the Board\u0027s Second Review of the Inspection Panel\", because it seems to us that review actually affects on the result of the process in this case.", "subitem_description_type": "Abstract"}]}, "item_7_full_name_3": {"attribute_name": "著者別名", "attribute_value_mlt": [{"nameIdentifiers": [{"nameIdentifier": "56549", "nameIdentifierScheme": "WEKO"}], "names": [{"name": "Sato, Akira"}]}]}, "item_7_publisher_7": {"attribute_name": "出版者", "attribute_value_mlt": [{"subitem_publisher": "新潟大学大学院現代社会文化研究科"}]}, "item_7_select_19": {"attribute_name": "著者版フラグ", "attribute_value_mlt": [{"subitem_select_item": "publisher"}]}, "item_7_source_id_11": {"attribute_name": "書誌レコードID", "attribute_value_mlt": [{"subitem_source_identifier": "AN1046766X", "subitem_source_identifier_type": "NCID"}]}, "item_7_source_id_9": {"attribute_name": "ISSN", "attribute_value_mlt": [{"subitem_source_identifier": "13458485", "subitem_source_identifier_type": "ISSN"}]}, "item_creator": {"attribute_name": "著者", "attribute_type": "creator", "attribute_value_mlt": [{"creatorNames": [{"creatorName": "佐藤, 哲"}], "nameIdentifiers": [{"nameIdentifier": "56548", "nameIdentifierScheme": "WEKO"}]}]}, "item_files": {"attribute_name": "ファイル情報", "attribute_type": "file", "attribute_value_mlt": [{"accessrole": "open_date", "date": [{"dateType": "Available", "dateValue": "2019-08-06"}], "displaytype": "detail", "download_preview_message": "", "file_order": 0, "filename": "18_0145.pdf", "filesize": [{"value": "152.3 kB"}], "format": "application/pdf", "future_date_message": "", "is_thumbnail": false, "licensetype": "license_free", "mimetype": "application/pdf", "size": 152300.0, "url": {"label": "18_0145.pdf", "url": "https://niigata-u.repo.nii.ac.jp/record/7815/files/18_0145.pdf"}, "version_id": "33d8cdac-e9c2-4928-8499-b1938e68fa13"}]}, "item_keyword": {"attribute_name": "キーワード", "attribute_value_mlt": [{"subitem_subject": "査閲パネル", "subitem_subject_scheme": "Other"}, {"subitem_subject": "青海プロジェクト", "subitem_subject_scheme": "Other"}, {"subitem_subject": "パネル制度見直し", "subitem_subject_scheme": "Other"}]}, "item_language": {"attribute_name": "言語", "attribute_value_mlt": [{"subitem_language": "jpn"}]}, "item_resource_type": {"attribute_name": "資源タイプ", "attribute_value_mlt": [{"resourcetype": "departmental bulletin paper", "resourceuri": "http://purl.org/coar/resource_type/c_6501"}]}, "item_title": "中国西部貧困削減プロジェクトにおける世界銀行査閲パネルの実行", "item_titles": {"attribute_name": "タイトル", "attribute_value_mlt": [{"subitem_title": "中国西部貧困削減プロジェクトにおける世界銀行査閲パネルの実行"}, {"subitem_title": "中国西部貧困削減プロジェクトにおける世界銀行査閲パネルの実行", "subitem_title_language": "en"}]}, "item_type_id": "7", "owner": "1", "path": ["456", "809"], "permalink_uri": "http://hdl.handle.net/10191/979", "pubdate": {"attribute_name": "公開日", "attribute_value": "2007-04-18"}, "publish_date": "2007-04-18", "publish_status": "0", "recid": "7815", "relation": {}, "relation_version_is_last": true, "title": ["中国西部貧困削減プロジェクトにおける世界銀行査閲パネルの実行"], "weko_shared_id": null}
  1. 210 大学院現代社会文化研究科
  2. 20 紀要
  3. 01 現代社会文化研究
  4. 第29号
  1. 0 資料タイプ別
  2. 03 紀要論文

中国西部貧困削減プロジェクトにおける世界銀行査閲パネルの実行

http://hdl.handle.net/10191/979
http://hdl.handle.net/10191/979
40bf9fdb-d409-41df-a6a8-74ca9d25bcee
名前 / ファイル ライセンス アクション
18_0145.pdf 18_0145.pdf (152.3 kB)
Item type 紀要論文 / Departmental Bulletin Paper(1)
公開日 2007-04-18
タイトル
タイトル 中国西部貧困削減プロジェクトにおける世界銀行査閲パネルの実行
タイトル
言語 en
タイトル 中国西部貧困削減プロジェクトにおける世界銀行査閲パネルの実行
言語
言語 jpn
キーワード
主題Scheme Other
主題 査閲パネル
キーワード
主題Scheme Other
主題 青海プロジェクト
キーワード
主題Scheme Other
主題 パネル制度見直し
資源タイプ
資源 http://purl.org/coar/resource_type/c_6501
タイプ departmental bulletin paper
その他のタイトル
その他のタイトル The Inspection Panel of the World Bank in Practice : A Case Study of the China Western Poverty Reduction Project
著者 佐藤, 哲

× 佐藤, 哲

WEKO 56548

佐藤, 哲

Search repository
著者別名
識別子 56549
識別子Scheme WEKO
姓名 Sato, Akira
抄録
内容記述タイプ Abstract
内容記述 The Inspection Panel of the World Bank was established as an appeals mechanism that receives claims from citizens who believe they have been directly harmed by the Bank's projects. Although the establishment of the Inspection Panel was an important step in moving toward more transparency of World Bank operations and the improvement in the Bank's accountability, and ultimately toward improved project quality at the Bank, there are still several problems in this Inspection Panel process that can be mentioned. This paper focuses on problems in the Inspection Panel process brought about by the Request for Inspection that alleged the Bank's non-compliance with its policies in West Poverty Reduction Project in China, and that in the Panel's investigation report for the Project. For the first time since Nepal ArunⅢ Proposed Hydroelectric Project case, the Panel was allowed to carry out its investigation,and as the result, the Bank's financing to the project was cancelled. Added to these , this paper refers to the contents of "1999 Conclusions of the Board's Second Review of the Inspection Panel", because it seems to us that review actually affects on the result of the process in this case.
書誌情報 現代社会文化研究
en : 現代社会文化研究

巻 29, p. 177-189, 発行日 2004-03
出版者
出版者 新潟大学大学院現代社会文化研究科
ISSN
収録物識別子タイプ ISSN
収録物識別子 13458485
書誌レコードID
収録物識別子タイプ NCID
収録物識別子 AN1046766X
著者版フラグ
値 publisher
戻る
0
views
See details
Views

Versions

Ver.1 2021-03-01 19:01:36.752722
Show All versions

Share

Mendeley Twitter Facebook Print Addthis

Cite as

エクスポート

OAI-PMH
  • OAI-PMH JPCOAR
  • OAI-PMH DublinCore
  • OAI-PMH DDI
Other Formats
  • JSON
  • BIBTEX

Confirm


Powered by WEKO3


Powered by WEKO3